Projects

Bellows Street Sanitary Pump Statoin Reconstruction, Warwick RI, 2013

This Gorman-Rupp duplex suction lift sewage pumping station reconstruction was built to the 500 year floodplain for the City of Warwick. The prefabricated concrete structure for this pump station was made by L&L Concrete out of Oxford MA.

Reviewing Engineer: Crossman Engineering, Warwick, RI

Project Downloads