Projects

Bellows Street Sanitary Pump Statoin Reconstruction, Warwick RI, 2013

This Gorman-Rupp duplex suction lift sewage pumping station reconstruction was built to the 500 year floodplain for the City of Warwick. The prefabricated concrete structure for this pump station was made by L&L Concrete out of Oxford MA.

Reviewing Engineer: Crossman Engineering, Warwick, RI

Project Downloads

Click for next image
 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
23 
24 
25 
26 
27 
28 
29 
30 
31 
32 
33 
34 
35